WHAT WE DID
- Attended site with a cherry picker to temporarily affix the loose cladding.
- Erected an emergency scaffold to secure the remaining unfixed cladding.
- In line with the Employers Requirement document, we designed a full A1 rated Cedral Click Cladding System with Siderise cavity barriers horizontally and vertically, as well as replacement A1 rated Hyperon Aluminium timber decking.
- We obtained Building Control Plans Approval.
- We stripped the shiplap board from building and disposed them safely from site whilst maintaining its waterproof integrity.
- We fitted the new cladding system according to all manufacturer’s guidelines as well as replacing defective fixings to the soffit panels.
- Removed the existing cantilevered balconies and refixed them securely to the new system.
- Replaced all decking to the balconies.
- We liaised with the Building Control Officer and achieved a Building Control Certificate on Completion and the building achieved EWS1 form with A1 rating.
- Repaired the negative falls to the rainwater disposal system, identified the roof leaks and carried out patch repairs.