WHAT WE DID
-
Carried out remedial works to 800 doors while causing minimal disruption to residents.
-
All repairs were carried out to BM TRADA recommendations.
-
To achieve the minimum 2-4mm gaps around the door leaf to the frame we needed to remove architraves and adjust frames while making sure fire stopping was not compromised.
-
Reinstalled intumescent smoke seals previously incorrectly installed and where adjusted threshold gaps throughout the project.