WHAT WE DID
- In line with the Employers Requirement document, we designed a full new A2 rated SPS Envirowall Render System with a fully filled cavity, as well as a composite decking system of reduced combustibility.
- We obtained Building Control Plans Approval.
- We stripped the whole building of the existing render system whilst maintaining its waterproof integrity.
- We repaired any defects in the substrate.
- We fitted the new SPS Render System to all manufacturers guidelines.
- Fitted new composite decking.
- We attended monthly meetings with the residents to keep them updated on the works and produced a weekly Red Scheme Report on progress.
- Completed the works on time in line with our Contract.
- We liaised with the Building Control Officer and achieved a Building Control Certificate on Completion.
- We overlaid the existing main roof with a Garland Liquid System and provided our client with a manufacturer’s 20 year guarantee.